100% Original Heated Floor Manifold - Brass Manifold With drain valve – Xinfan
100% Original Heated Floor Manifold - Brass Manifold With drain valve – Xinfan Detail:
| Warranty: | 2 Years | Brand Name: | SUNFLY |
| After-sale Service: | Online technical support | Model Number: | XF20005A |
| MOQ: | 1 set brass manifold | Type: | Floor Heating Systems |
| Product name: | Brass Manifold With drain valve | Keywords: | Brass Manifold With drain valve |
| Application: | Apartment | Color: | Nickel plated |
| Design Style: | Modern | Size: | 1”,1-1/4”,2-12 Ways |
| Place of Origin: | Zhejiang, China | ||
| Brass Project Solution Capability: | Graphic design,3D model design,total solution for Projects,Cross Categories Consolidation | ||
Product parameters
Model:XF2005A |
Specifications |
| 1’’X2WAYS | |
| 1’’X3WAYS | |
| 1’’X4WAYS | |
| 1’’X5WAYS | |
| 1’’X6WAYS | |
| 1’’X7WAYS | |
| 1’’X8WAYS | |
| 1’’X9WAYS | |
| 1’’X10WAYS | |
| 1’’X11WAYS | |
| 1’’X12WAYS |
![]() |
A: 1’’ |
|
B: 3/4’’ |
|
|
C: 50 |
|
|
D: 250 |
|
|
E: 210 |
|
|
F: 322 |
Product material
Brass Hpb57-3(Accepting other copper materials with customer-specified, such as Hpb58-2,Hpb59-1,CW617N,CW603N and so on)

Processing Steps

Raw Material, Forging, Roughcast,Slinging, CNC Machining, Inspection, Leaking Test, Assembly, Warehouse, Shipping

Material Testing, Raw Material Warehouse, Put In Material, Self-Inspection, First Inspection, Circle Inspection, Forging, Annealing, Self-Inspection, First Inspection, Circle Inspection, Machining, Self-Inspection, First Inspection, Circle Inspection, Finished Inspection, Semi-Finished Warehouse, Assembling, First Inspection, Circle Inspection, 100% Seal Testing, Final Random Inspection, Finished Product Warehouse, Delivering
Applications
Hot or cold water, heating system, mix water system, Construction materials etc.

Main Export Markets
Europe, East-Europe, Russia, Middle-Asia, North America, South America and so on.
Product description
What is the temperature difference between the inlet and the return water of the floor heating manifold.
Floor heating is low-temperature heating. The temperature of the inlet water of the heat source is generally controlled at 50-55 degrees; the return water temperature is generally between 30-35 degrees, the temperature of the water supply is higher than the body temperature of the human body, and the temperature of the return water is lower than the body temperature of the human body, so the water supply feel hot,but the return water is not be hot.
The standard for judging whether the heating condition of underfloor heating is qualified is:the room temperature can reach the temperature required by the local heating.The indoor temperature requirement for heating in most areas is that the room temperature is above 18 degrees (that is, the heating condition is deemed to be up to the standard). Floor heating and radiators is a separate tube!
Note: Floor heating is generally arranged with a water divider according to a room and a loop, especially when it is mixed with a radiator.

Product detail pictures:
Related Product Guide:
The incredibly rich projects administration experiences and a person to 1 service model make the substantial importance of organization communication and our easy understanding of your expectations for 100% Original Heated Floor Manifold - Brass Manifold With drain valve – Xinfan , The product will supply to all over the world, such as: South Korea, Argentina, Dominica, We honor ourselves as a company that comprises of a strong team of professionals who are innovative and well experienced in the international trading, business development and product advancement. Moreover, the company stays unique among its competitors due to its superior standard of quality in production, and its efficiency and flexibility in business support.
With a positive attitude of "regard the market, regard the custom, regard the science", the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.
