2021 China New Design Central Underfloor Heating Manifold System - Brass Manifold With flow meter and drain valve – Xinfan
2021 China New Design Central Underfloor Heating Manifold System - Brass Manifold With flow meter and drain valve – Xinfan Detail:
| Warranty: | 2 Years | Model Number: | XF20005 |
| After-sale Service: | Online technical support | Type: | Floor Heating Systems |
| Brand Name: | SUNFLY | Keywords: | Brass Manifold With flow meter and drain valve |
| Application: | Apartment | Color: | Nickel plated |
| Size: | 1”,1-1/4”,2-12 Ways | MOQ: | 1 sets brass manifold |
| Design Style: | Modern | Place of Origin: | Zhejiang, China, |
| Product name: | Brass Manifold With flow meter and drain valve | ||
| Brass Project Solution Capability: | Graphic design,3D model design,total solution for Projects,Cross Categories Consolidation | ||
Product parameters
Model:XF2005 |
Specifications |
| 1’’X2WAYS | |
| 1’’X3WAYS | |
| 1’’X4WAYS | |
| 1’’X5WAYS | |
| 1’’X6WAYS | |
| 1’’X7WAYS | |
| 1’’X8WAYS | |
| 1’’X9WAYS | |
| 1’’X10WAYS | |
| 1’’X11WAYS | |
| 1’’X12WAYS |
![]() |
A: 1’’ |
|
B: 3/4’’ |
|
|
C: 50 |
|
|
D: 250 |
|
|
E: 210 |
|
|
F: 322 |
Product material
Brass Hpb57-3(Accepting other copper materials with customer-specified, such as Hpb58-2,Hpb59-1,CW617N,CW603N and so on)

Processing Steps

Raw Material, Forging, Roughcast, Slinging, CNC Machining, Inspection, Leaking Test, Assembly, Warehouse, Shipping

Material Testing, Raw Material Warehouse, Put In Material, Self-Inspection, First Inspection, Circle Inspection, Forging, Annealing, Self-Inspection, First Inspection, Circle Inspection, Machining, Self-Inspection, First Inspection, Circle Inspection, Finished Inspection, Semi-Finished Warehouse, Assembling, First Inspection, Circle Inspection, 100% Seal Testing, Final Random Inspection, Finished Product Warehouse, Delivering
Applications
Hot or cold water,heating system,mix water system,Construction materials etc.

Main Export Markets
Europe,East-Europe,Russia,Middle-Asia,North America,South America and so on.
Product description
What is the temperature difference between the inlet and the return water of the floor heating manifold.
Floor heating is low-temperature heating. The temperature of the inlet water of the heat source is generally controlled at 50-55 degrees; the return water temperature is generally between 30-35 degrees, the temperature of the water supply is higher than the body temperature of the human body, and the temperature of the return water is lower than the body temperature of the human body, so the water supply feel hot,but the return water is not be hot.
The standard for judging whether the heating condition of underfloor heating is qualified is: the room temperature can reach the temperature required by the local heating. The indoor temperature requirement for heating in most areas is that the room temperature is above 18 degrees (that is, the heating condition is deemed to be up to the standard). Floor heating and radiators is a separate tube!
Note: Floor heating is generally arranged with a water divider according to a room and a loop, especially when it is mixed with a radiator.

Product detail pictures:
Related Product Guide:
Our primary intention should be to offer our clientele a serious and responsible enterprise relationship, delivering personalized attention to all of them for 2021 China New Design Central Underfloor Heating Manifold System - Brass Manifold With flow meter and drain valve – Xinfan , The product will supply to all over the world, such as: Hamburg, Accra, Australia, For many years, we now have adhered to the principle of customer oriented, quality based, excellence pursuing, mutual benefit sharing. We hope, with great sincerity and good will, to have the honor to help with your further market.
Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
