2021 wholesale price Underfloor Heating Manifold - Brass Manifold With flow meter and drain valve – Xinfan
2021 wholesale price Underfloor Heating Manifold - Brass Manifold With flow meter and drain valve – Xinfan Detail:
Warranty: | 2 Years | Model Number: | XF20005 |
After-sale Service: | Online technical support | Type: | Floor Heating Systems |
Brand Name: | SUNFLY | Keywords: | Brass Manifold With flow meter and drain valve |
Application: | Apartment | Color: | Nickel plated |
Size: | 1”,1-1/4”,2-12 Ways | MOQ: | 1 sets brass manifold |
Design Style: | Modern | Place of Origin: | Zhejiang, China, |
Product name: | Brass Manifold With flow meter and drain valve | ||
Brass Project Solution Capability: | Graphic design,3D model design,total solution for Projects,Cross Categories Consolidation |
Product parameters
![]() Model:XF2005 |
Specifications |
1’’X2WAYS | |
1’’X3WAYS | |
1’’X4WAYS | |
1’’X5WAYS | |
1’’X6WAYS | |
1’’X7WAYS | |
1’’X8WAYS | |
1’’X9WAYS | |
1’’X10WAYS | |
1’’X11WAYS | |
1’’X12WAYS |
![]() |
A: 1’’ |
B: 3/4’’ |
|
C: 50 |
|
D: 250 |
|
E: 210 |
|
F: 322 |
Product material
Brass Hpb57-3(Accepting other copper materials with customer-specified, such as Hpb58-2,Hpb59-1,CW617N,CW603N and so on)
Processing Steps
Raw Material, Forging, Roughcast, Slinging, CNC Machining, Inspection, Leaking Test, Assembly, Warehouse, Shipping
Material Testing, Raw Material Warehouse, Put In Material, Self-Inspection, First Inspection, Circle Inspection, Forging, Annealing, Self-Inspection, First Inspection, Circle Inspection, Machining, Self-Inspection, First Inspection, Circle Inspection, Finished Inspection, Semi-Finished Warehouse, Assembling, First Inspection, Circle Inspection, 100% Seal Testing, Final Random Inspection, Finished Product Warehouse, Delivering
Applications
Hot or cold water,heating system,mix water system,Construction materials etc.
Main Export Markets
Europe,East-Europe,Russia,Middle-Asia,North America,South America and so on.
Product description
What is the temperature difference between the inlet and the return water of the floor heating manifold.
Floor heating is low-temperature heating. The temperature of the inlet water of the heat source is generally controlled at 50-55 degrees; the return water temperature is generally between 30-35 degrees, the temperature of the water supply is higher than the body temperature of the human body, and the temperature of the return water is lower than the body temperature of the human body, so the water supply feel hot,but the return water is not be hot.
The standard for judging whether the heating condition of underfloor heating is qualified is: the room temperature can reach the temperature required by the local heating. The indoor temperature requirement for heating in most areas is that the room temperature is above 18 degrees (that is, the heating condition is deemed to be up to the standard). Floor heating and radiators is a separate tube!
Note: Floor heating is generally arranged with a water divider according to a room and a loop, especially when it is mixed with a radiator.
Product detail pictures:

Related Product Guide:
All we do is usually connected with our tenet " Customer to start with, Rely on initial, devoting on the food packaging and environmental protection for 2021 wholesale price Underfloor Heating Manifold - Brass Manifold With flow meter and drain valve – Xinfan , The product will supply to all over the world, such as: Jamaica, French, Brunei, We have been very responsible for all details on our customers order no matter on warranty quality, satisfied prices, quick delivery, on time communication, satisfied packing, easy payment terms, best shipment terms, after sales service etc. We provide one-stop service and best reliability to our every customers. We work hard with our customers, colleagues, workers to make a better future.

In China, we have many partners, this company is the most satisfying to us, reliable quality and good credit, it is worth appreciation.
