Excellent quality Manifold Gauge - Brass Manifold With drain valve – Xinfan
Excellent quality Manifold Gauge - Brass Manifold With drain valve – Xinfan Detail:
Warranty: | 2 Years | Brand Name: | SUNFLY |
After-sale Service: | Online technical support | Model Number: | XF20005A |
MOQ: | 1 set brass manifold | Type: | Floor Heating Systems |
Product name: | Brass Manifold With drain valve | Keywords: | Brass Manifold With drain valve |
Application: | Apartment | Color: | Nickel plated |
Design Style: | Modern | Size: | 1”,1-1/4”,2-12 Ways |
Place of Origin: | Zhejiang, China | ||
Brass Project Solution Capability: | Graphic design,3D model design,total solution for Projects,Cross Categories Consolidation |
Product parameters
Model:XF2005A |
Specifications |
1’’X2WAYS | |
1’’X3WAYS | |
1’’X4WAYS | |
1’’X5WAYS | |
1’’X6WAYS | |
1’’X7WAYS | |
1’’X8WAYS | |
1’’X9WAYS | |
1’’X10WAYS | |
1’’X11WAYS | |
1’’X12WAYS |
A: 1’’ |
|
B: 3/4’’ |
|
C: 50 |
|
D: 250 |
|
E: 210 |
|
F: 322 |
Product material
Brass Hpb57-3(Accepting other copper materials with customer-specified, such as Hpb58-2,Hpb59-1,CW617N,CW603N and so on)
Processing Steps
Raw Material, Forging, Roughcast,Slinging, CNC Machining, Inspection, Leaking Test, Assembly, Warehouse, Shipping
Material Testing, Raw Material Warehouse, Put In Material, Self-Inspection, First Inspection, Circle Inspection, Forging, Annealing, Self-Inspection, First Inspection, Circle Inspection, Machining, Self-Inspection, First Inspection, Circle Inspection, Finished Inspection, Semi-Finished Warehouse, Assembling, First Inspection, Circle Inspection, 100% Seal Testing, Final Random Inspection, Finished Product Warehouse, Delivering
Applications
Hot or cold water, heating system, mix water system, Construction materials etc.
Main Export Markets
Europe, East-Europe, Russia, Middle-Asia, North America, South America and so on.
Product description
What is the temperature difference between the inlet and the return water of the floor heating manifold.
Floor heating is low-temperature heating. The temperature of the inlet water of the heat source is generally controlled at 50-55 degrees; the return water temperature is generally between 30-35 degrees, the temperature of the water supply is higher than the body temperature of the human body, and the temperature of the return water is lower than the body temperature of the human body, so the water supply feel hot,but the return water is not be hot.
The standard for judging whether the heating condition of underfloor heating is qualified is:the room temperature can reach the temperature required by the local heating.The indoor temperature requirement for heating in most areas is that the room temperature is above 18 degrees (that is, the heating condition is deemed to be up to the standard). Floor heating and radiators is a separate tube!
Note: Floor heating is generally arranged with a water divider according to a room and a loop, especially when it is mixed with a radiator.
Product detail pictures:
Related Product Guide:
Assume full accountability to fulfill all demands of our purchasers; attain continual advancements by marketing the advancement of our clientele; grow to be the final permanent cooperative partner of purchasers and maximize the interests of purchasers for Excellent quality Manifold Gauge - Brass Manifold With drain valve – Xinfan , The product will supply to all over the world, such as: Doha, Brisbane, Malawi, All the employees in factory, store, and office are struggling for one common goal to provide better quality and service. Real business is to get win-win situation. We would like to provide more support for customers. Welcome all nice buyers to communicate details of our products with us!
By Leona from Finland - 2017.11.11 11:41
The company can keep up with the changes in this industry market, product updates fast and the price is cheap, this is our second cooperation, it's good.
By Kim from Iceland - 2017.05.02 18:28