Factory wholesale Brass Under Heating Collectors - Brass Manifold With drain valve – Xinfan
Factory wholesale Brass Under Heating Collectors - Brass Manifold With drain valve – Xinfan Detail:
| Warranty: | 2 Years | Brand Name: | SUNFLY |
| After-sale Service: | Online technical support | Model Number: | XF20005A |
| MOQ: | 1 set brass manifold | Type: | Floor Heating Systems |
| Product name: | Brass Manifold With drain valve | Keywords: | Brass Manifold With drain valve |
| Application: | Apartment | Color: | Nickel plated |
| Design Style: | Modern | Size: | 1”,1-1/4”,2-12 Ways |
| Place of Origin: | Zhejiang, China | ||
| Brass Project Solution Capability: | Graphic design,3D model design,total solution for Projects,Cross Categories Consolidation | ||
Product parameters
Model:XF2005A |
Specifications |
| 1’’X2WAYS | |
| 1’’X3WAYS | |
| 1’’X4WAYS | |
| 1’’X5WAYS | |
| 1’’X6WAYS | |
| 1’’X7WAYS | |
| 1’’X8WAYS | |
| 1’’X9WAYS | |
| 1’’X10WAYS | |
| 1’’X11WAYS | |
| 1’’X12WAYS |
![]() |
A: 1’’ |
|
B: 3/4’’ |
|
|
C: 50 |
|
|
D: 250 |
|
|
E: 210 |
|
|
F: 322 |
Product material
Brass Hpb57-3(Accepting other copper materials with customer-specified, such as Hpb58-2,Hpb59-1,CW617N,CW603N and so on)

Processing Steps

Raw Material, Forging, Roughcast,Slinging, CNC Machining, Inspection, Leaking Test, Assembly, Warehouse, Shipping

Material Testing, Raw Material Warehouse, Put In Material, Self-Inspection, First Inspection, Circle Inspection, Forging, Annealing, Self-Inspection, First Inspection, Circle Inspection, Machining, Self-Inspection, First Inspection, Circle Inspection, Finished Inspection, Semi-Finished Warehouse, Assembling, First Inspection, Circle Inspection, 100% Seal Testing, Final Random Inspection, Finished Product Warehouse, Delivering
Applications
Hot or cold water, heating system, mix water system, Construction materials etc.

Main Export Markets
Europe, East-Europe, Russia, Middle-Asia, North America, South America and so on.
Product description
What is the temperature difference between the inlet and the return water of the floor heating manifold.
Floor heating is low-temperature heating. The temperature of the inlet water of the heat source is generally controlled at 50-55 degrees; the return water temperature is generally between 30-35 degrees, the temperature of the water supply is higher than the body temperature of the human body, and the temperature of the return water is lower than the body temperature of the human body, so the water supply feel hot,but the return water is not be hot.
The standard for judging whether the heating condition of underfloor heating is qualified is:the room temperature can reach the temperature required by the local heating.The indoor temperature requirement for heating in most areas is that the room temperature is above 18 degrees (that is, the heating condition is deemed to be up to the standard). Floor heating and radiators is a separate tube!
Note: Floor heating is generally arranged with a water divider according to a room and a loop, especially when it is mixed with a radiator.

Product detail pictures:
Related Product Guide:
Our pursuit and enterprise goal is to "Always satisfy our customer requirements". We keep on to establish and style and design outstanding top quality goods for both our outdated and new prospects and realize a win-win prospect for our clientele likewise as us for Factory wholesale Brass Under Heating Collectors - Brass Manifold With drain valve – Xinfan , The product will supply to all over the world, such as: Greenland, Bandung, Kenya, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
We are old friends, the company's product quality has been always very good and this time the price is also very cheap.
