Good Quality Manifold - Brass Manifold With flow meter and drain valve – Xinfan
Good Quality Manifold - Brass Manifold With flow meter and drain valve – Xinfan Detail:
Warranty: | 2 Years | Model Number: | XF20005 |
After-sale Service: | Online technical support | Type: | Floor Heating Systems |
Brand Name: | SUNFLY | Keywords: | Brass Manifold With flow meter and drain valve |
Application: | Apartment | Color: | Nickel plated |
Size: | 1”,1-1/4”,2-12 Ways | MOQ: | 1 sets brass manifold |
Design Style: | Modern | Place of Origin: | Zhejiang, China, |
Product name: | Brass Manifold With flow meter and drain valve | ||
Brass Project Solution Capability: | Graphic design,3D model design,total solution for Projects,Cross Categories Consolidation |
Product parameters
![]() Model:XF2005 |
Specifications |
1’’X2WAYS | |
1’’X3WAYS | |
1’’X4WAYS | |
1’’X5WAYS | |
1’’X6WAYS | |
1’’X7WAYS | |
1’’X8WAYS | |
1’’X9WAYS | |
1’’X10WAYS | |
1’’X11WAYS | |
1’’X12WAYS |
![]() |
A: 1’’ |
B: 3/4’’ |
|
C: 50 |
|
D: 250 |
|
E: 210 |
|
F: 322 |
Product material
Brass Hpb57-3(Accepting other copper materials with customer-specified, such as Hpb58-2,Hpb59-1,CW617N,CW603N and so on)
Processing Steps
Raw Material, Forging, Roughcast, Slinging, CNC Machining, Inspection, Leaking Test, Assembly, Warehouse, Shipping
Material Testing, Raw Material Warehouse, Put In Material, Self-Inspection, First Inspection, Circle Inspection, Forging, Annealing, Self-Inspection, First Inspection, Circle Inspection, Machining, Self-Inspection, First Inspection, Circle Inspection, Finished Inspection, Semi-Finished Warehouse, Assembling, First Inspection, Circle Inspection, 100% Seal Testing, Final Random Inspection, Finished Product Warehouse, Delivering
Applications
Hot or cold water,heating system,mix water system,Construction materials etc.
Main Export Markets
Europe,East-Europe,Russia,Middle-Asia,North America,South America and so on.
Product description
What is the temperature difference between the inlet and the return water of the floor heating manifold.
Floor heating is low-temperature heating. The temperature of the inlet water of the heat source is generally controlled at 50-55 degrees; the return water temperature is generally between 30-35 degrees, the temperature of the water supply is higher than the body temperature of the human body, and the temperature of the return water is lower than the body temperature of the human body, so the water supply feel hot,but the return water is not be hot.
The standard for judging whether the heating condition of underfloor heating is qualified is: the room temperature can reach the temperature required by the local heating. The indoor temperature requirement for heating in most areas is that the room temperature is above 18 degrees (that is, the heating condition is deemed to be up to the standard). Floor heating and radiators is a separate tube!
Note: Floor heating is generally arranged with a water divider according to a room and a loop, especially when it is mixed with a radiator.
Product detail pictures:

Related Product Guide:
We are also focusing on improving the stuff management and QC system so that we could keep great advantage in the fiercely-competitive business for Good Quality Manifold - Brass Manifold With flow meter and drain valve – Xinfan , The product will supply to all over the world, such as: UK, Vietnam, Mumbai, Excellent quality comes from our adherence to every detail, and customer satisfaction comes from our sincere dedication. Relying on advanced technology and industry reputation of good cooperation, we try our best to provide more quality products and services to our customers, and all of us are willing to strengthen exchanges with domestic and foreign customers and sincere cooperation, to build a better future.

This enterprise in the industry is strong and competitive, advancing with the times and develop sustainable, we are very pleased to have a opportunity to cooperate!
