Lowest Price for Stainless Steel Manifold - Brass Manifold With flow meter and drain valve – Xinfan
Lowest Price for Stainless Steel Manifold - Brass Manifold With flow meter and drain valve – Xinfan Detail:
| Warranty: | 2 Years | Model Number: | XF20005 |
| After-sale Service: | Online technical support | Type: | Floor Heating Systems |
| Brand Name: | SUNFLY | Keywords: | Brass Manifold With flow meter and drain valve |
| Application: | Apartment | Color: | Nickel plated |
| Size: | 1”,1-1/4”,2-12 Ways | MOQ: | 1 sets brass manifold |
| Design Style: | Modern | Place of Origin: | Zhejiang, China, |
| Product name: | Brass Manifold With flow meter and drain valve | ||
| Brass Project Solution Capability: | Graphic design,3D model design,total solution for Projects,Cross Categories Consolidation | ||
Product parameters
Model:XF2005 |
Specifications |
| 1’’X2WAYS | |
| 1’’X3WAYS | |
| 1’’X4WAYS | |
| 1’’X5WAYS | |
| 1’’X6WAYS | |
| 1’’X7WAYS | |
| 1’’X8WAYS | |
| 1’’X9WAYS | |
| 1’’X10WAYS | |
| 1’’X11WAYS | |
| 1’’X12WAYS |
![]() |
A: 1’’ |
|
B: 3/4’’ |
|
|
C: 50 |
|
|
D: 250 |
|
|
E: 210 |
|
|
F: 322 |
Product material
Brass Hpb57-3(Accepting other copper materials with customer-specified, such as Hpb58-2,Hpb59-1,CW617N,CW603N and so on)

Processing Steps

Raw Material, Forging, Roughcast, Slinging, CNC Machining, Inspection, Leaking Test, Assembly, Warehouse, Shipping

Material Testing, Raw Material Warehouse, Put In Material, Self-Inspection, First Inspection, Circle Inspection, Forging, Annealing, Self-Inspection, First Inspection, Circle Inspection, Machining, Self-Inspection, First Inspection, Circle Inspection, Finished Inspection, Semi-Finished Warehouse, Assembling, First Inspection, Circle Inspection, 100% Seal Testing, Final Random Inspection, Finished Product Warehouse, Delivering
Applications
Hot or cold water,heating system,mix water system,Construction materials etc.

Main Export Markets
Europe,East-Europe,Russia,Middle-Asia,North America,South America and so on.
Product description
What is the temperature difference between the inlet and the return water of the floor heating manifold.
Floor heating is low-temperature heating. The temperature of the inlet water of the heat source is generally controlled at 50-55 degrees; the return water temperature is generally between 30-35 degrees, the temperature of the water supply is higher than the body temperature of the human body, and the temperature of the return water is lower than the body temperature of the human body, so the water supply feel hot,but the return water is not be hot.
The standard for judging whether the heating condition of underfloor heating is qualified is: the room temperature can reach the temperature required by the local heating. The indoor temperature requirement for heating in most areas is that the room temperature is above 18 degrees (that is, the heating condition is deemed to be up to the standard). Floor heating and radiators is a separate tube!
Note: Floor heating is generally arranged with a water divider according to a room and a loop, especially when it is mixed with a radiator.

Product detail pictures:
Related Product Guide:
"Sincerity, Innovation, Rigorousness, and Efficiency" may be the persistent conception of our organization to the long-term to build together with shoppers for mutual reciprocity and mutual advantage for Lowest Price for Stainless Steel Manifold - Brass Manifold With flow meter and drain valve – Xinfan , The product will supply to all over the world, such as: Bandung, Provence, Swaziland, Many kinds of different solutions are available for you to choose, you can do one-stop shopping here. And customized orders are acceptable. Real business is to get win-win situation, if possible, we would like to deliver more support for customers. Welcome all nice buyers communicate details of solutions with us!!
This is a reputable company, they have a high level of business management, good quality product and service, every cooperation is assured and delighted!
