Short Lead Time for Four Parts Mixing Valve - Mixing water system /The water mixing center – Xinfan

Basic Info

Product Detail

Product Tags

Related Video

Feedback (2)

Our target should be to consolidate and improve the high-quality and repair of current goods, in the meantime regularly produce new solutions to meet unique customers' needs for Adjusting Water Pressure Reducing Valve, Radiator Valve Head, Brass Radiator Valve, We sincerely welcome overseas consumers to consult for your long-term cooperation as well as the mutual advancement.We strongly think that we will do superior and far better.
Short Lead Time for Four Parts Mixing Valve - Mixing water system /The water mixing center – Xinfan Detail:

Warranty: 2 Years After-sale Service: Online technical support
Application: Apartment Design Style: Modern
Place of Origin: Zhejiang, China Brand Name: SUNFLY
Type: Floor Heating Systems Keywords: Brass Water Mixing System
Color: Nickel plated Size: 1″
MOQ: 5 sets Name: Water Mixing system
Model Number  XF15231
Brass Project Solution Capability graphic design, 3D model design, total solution for Projects, Cross Categories Consolidation

Product parameters

 MIX SYSTEM XF15231
Specifications SIZE:
1”

 

MIX SYSTEM XF15231

A: 1’’

B: 1’’

C: 210

D: 287

L: 267

Product material

Brass Hpb57-3(Accepting other copper materials with customer-specified, such as Hpb58-2,Hpb59-1,CW617N,CW603N and so on)

Processing Steps

Production Process

From raw material to finished product,process by Raw material,forging,roughcast, slingling,CNC machining,inspection,leaking test,assembly, finally packing and warehouse,shipping.

Production Process

Material Testing, Raw Material Warehouse, Put In Material, Self-Inspection, First Inspection, Circle Inspection, Forging, Annealing, Self-Inspection, First Inspection, Circle Inspection, Machining, Self-Inspection, First Inspection, Circle Inspection, Finished Inspection, Semi-Finished Warehouse, Assembling, First Inspection, Circle Inspection, 100% Seal Testing, Final Random Inspection, Finished Product Warehouse, Delivering

Applications

Hot or cold water, manifold for floor heating, heating system, mix water system, construction materials etc.

null
null

Main Export Markets

Europe,East-Europe,Russia,Middle-Asia,North America,South America and so on.

Product Description

The water mixing center is a water temperature and flow control system composed of a circulating water pump, an electric regulating valve, a ball valve with a thermometer, a controller, a temperature sensor, a filter valve, and a sub-catchment device.

The role of mixing center

The water mixing center adjusts the temperature of the high-temperature water provided by the wall-hung boiler through a thermostat and a regulating valve, and converts it into low-temperature water required for floor heating.

While adjusting the water temperature, the circulation pump can also be used to adjust the flow rate to improve the overall comfort of the floor heating.

In addition to these two main functions, the water mixing center also has functions such as reducing the temperature fluctuation of the outlet water of the wall-hung boiler.

Considering the safety and comfort of floor heating, the floor heating water temperature required by the national standard is not more than 60℃, and the suitable temperature is 35℃~45℃.

If the water outlet temperature of the wall-hung boiler is set at 45°C, it will be in a low-load operation state, and the thermal efficiency will often be lower than the optimal value, which also brings two problems:

1. The low temperature operation of the wall-hung boiler is likely to cause frequent start and stop of the equipment, which will increase the energy consumption and affect the service life of the wall-hung boiler.

2. Insufficient combustion of gas aggravates the carbon deposit of wall-hung boilers, which affects the normal use of wall-hung boilers for a long time.

PS: If it is a condensing furnace suitable for low-temperature operation, the above problems will not occur.

The installation of the water mixing center allows the wall-hung boiler heat source and the floor heating terminal to work in their respective suitable working conditions at the same time, which improves the efficiency of the system and reduces the frequent start and stop of the wall-hung boiler to a certain extent.

Secondly, the water mixing center will provide accurate water temperature and flow according to the needs of the room. While improving comfort, it also reduces energy consumption to a certain extent.


Product detail pictures:

Short Lead Time for Four Parts Mixing Valve - Mixing water system /The water mixing center – Xinfan detail pictures


Related Product Guide:

Using a total scientific good quality management process, superior high quality and excellent faith, we get great name and occupied this field for Short Lead Time for Four Parts Mixing Valve - Mixing water system /The water mixing center – Xinfan , The product will supply to all over the world, such as: Liberia, Jordan, Washington, We've got sufficient experience in producing products according to samples or drawings. We warmly welcome customers from home and abroad to visit our company, and to cooperate with us for a splendid future together.
  • We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
    5 Stars By Natividad from Mexico - 2018.10.31 10:02
    The accounts manager made a detailed introduction about the product, so that we have a comprehensive understanding of the product, and ultimately we decided to cooperate.
    5 Stars By Kevin Ellyson from Slovenia - 2017.07.07 13:00
    Write your message here and send it to us