Brass Manifold

Basic Info
  • Mode: XF20160G
  • Material: brass hpb57-3
  • Nominal Pressure: ≤10bar
  • Adjustment Scale: 0-5
  • Applicable Medium: cold and hot water
  • Working Temperature: t≤70℃
  • ActuatorConnection Thread: M30X1.5
  • connection Branch Pipe: 3/4"Xφ16 3/4"Xφ20
  • Connection thread: ISO 228 standard
  • Branch spacing: 50mm
  • Product Detail

    Product Tags

    Warranty: 2 Years Model Number: XF20160G
    After-sale Service: Online technical support Type: Floor Heating Systems
    Product name: Brass Manifold With Flow Meter Keywords: Brass Manifold With Flow Meter
    Design Style: Modern Color: Brass Raw surface
    Brand Name: SUNFLY Size: 1,1-1/4”,2-12WAYS
    Application: Apartment MOQ: 1 sets brass manifold
    Place of Origin: Zhejiang, China
    Brass Project Solution Capability: graphic design, 3D model design, total solution for Projects, Cross Categories

    Product parameters

     pro

    Model:XF20160G

    Specifications
    1’’X2WAYS
    1’’X3WAYS
    1’’X4WAYS
    1’’X5WAYS
    1’’X6WAYS
    1’’X7WAYS
    1’’X8WAYS
    1’’X9WAYS
    1’’X10WAYS
    1’’X11WAYS
    1’’X12WAYS

     

    uou

    A: 1’’

    B: 3/4’’

    C: 50

    D: 250

    E: 210

    F: 322

    Product material

    CW603N,(Accepting other copper materials with customer-specified, such as Brass Hpb57-3,Hpb58-2,Hpb59-1,CW617N,CW603N and so on)

    Processing Steps

    Production Process

    Raw Material, Forging, Roughcast,Slinging,  CNC Machining, Inspection, Leaking Test, Assembly, Warehouse, Shipping

    Production Process

    Material Testing, Raw Material Warehouse, Put In Material, Self-Inspection, First Inspection, Circle Inspection, Forging, Annealing, Self-Inspection, First Inspection, Circle Inspection, Machining, Self-Inspection, First Inspection, Circle Inspection, Finished Inspection, Semi-Finished Warehouse, Assembling, First Inspection, Circle Inspection, 100% Seal Testing, Final Random Inspection, Finished Product Warehouse, Delivering

    Applications

    Hot or cold water, heating system, mix water system, Construction materials etc.
    appli

    Product Description

    Clear floor heating water distributor
    The floor heating water distributor is generally equipped with a filter,which is specially used to prevent scale and blocking.Cleaning the floor heating water distributor is usually cleaning the filter on the water distributor.
    1. Close the inlet and return water valves,and then insert the pipe used for discharging water into the outlet air valve,and open the outlet air valve to release the pressure in the heating pipe.
    2. Open the nut of the filter with a wrench,take out the filter net,rinse with running water, and scrub with a waste toothbrush.
    3. Check whether there is any blockage at the outlet of the filter screen,and reinstall it on the filter after washing it clean.


  • Previous:
  • Next:

  • Write your message here and send it to us